This corresponds to assuming that
Star Student Project the IT infrastructure would be
sufficiently overprovisioned to avoid Star Student Project any
tier from saturating.Our method of determining H/W needs is based on
Star Student Project determining the marginal throughput. For
any given application, this requires Star Student Project us
to control bottleneck points and apply wide spectrum of workloads.
Once marginal Star Student Project Marginal throughput
measurements. Both graphs show how much Star Student Project
throughput gain there is by adding one more unit of resource. For
Jboss server Star Student Project we observe the marginal gain
by adding one more server that has single core. For Mysql Star
Student Project we add one more CPU core and
observe the marginal gain.